The crane (70 ton) gets ready |
View from the roof |
The OB2-30 and vertical for 2m/70cm |
Flying in the air |
Slowly getting into its place |
Arrived at the destination |
And lift up of the OB18-6 |
The antenna swinging |
Antenna ready to be fixed to the top tube |
ON4AMI (OO7P), Pat waiving |
ON6MR, Robert fixing the boom truss |
ON6MR, Robert left and ON4AMI (OO7P), Pat right |
Both antenna's aligned |
ON6MR, Robert adding the torsion bar |
And here is the final result |
The 70 ton crane finished his job... well done |